PWAG’s Generator Cable Set-up — Material List — Detailed Pictures

  • Version
  • Download 12
  • File Size 22.74 MB
  • File Count 1
  • Create Date December 14, 2021
  • Last Updated December 14, 2021

PWAG's Generator Cable Set-up -- Material List -- Detailed Pictures

On Dec 10, 2020, approval was voted on by the PWAG membership to purchase three used towable generators (2 X 150KW and 1 X 300KW) from the Walnut Valley Water District.  These generators will be stored at Valencia Heights Water Company, Quartz Hill, and Kinneloa Irrigation Dystric for use by PWAG members.

To use these generators, standardized hook-ups have been prepared by the Walnut Valley Water District.

Comments are closed.